General Discussion Anything SuperHawk Related

VTR project is 75% complete

Old Nov 9, 2009 | 05:45 AM
  #1  
aka Yamadog's Avatar
Thread Starter
Senior Member
Back Marker
 
Joined: Jan 2009
Posts: 179
From: Birmingham, AL
aka Yamadog is on a distinguished road
VTR project is 75% complete

Well its been almost a year and I still have not finished the SuperHawk. Thought I would post a couple of pics an get some feedback, criticism, or otherwise well intended advise. I have the SP1 front end to install and wheels to change. Heli-bars, Watsen turn signals, polished engine covers, and some mirrors which don't yet exist are next. The tank bra and Silver Honda wings are being deleted. The plan is to paint the new rear wheel RED and the front black. Also black paint on the lower cowl. Still considering Jet-Hot coating for the headers. I have not installed the velocity stacks or re-jetted yet. Jamie will be upgrading the suspension for me and after that...I'm going to ride!
Last pic...I still have the TBR cans FS in the classifieds. If they dont sell I'll shorten one and use it on the Versys.
Attached Thumbnails VTR project is 75% complete-super-hawk.jpg   VTR project is 75% complete-p1010177.jpg   VTR project is 75% complete-p1010104.jpg  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
98VTRrider
Everything Else
12
May 15, 2011 09:21 AM
Galaxieman
Modifications - Cosmetic
12
Oct 13, 2009 03:47 AM
seaton001
Modifications - Performance
37
May 8, 2007 12:45 PM
crazybrit
Classifieds
3
Apr 22, 2007 04:57 PM
Firehawk_ordie
Classifieds
8
Apr 17, 2007 08:13 PM


Thread Tools
Search this Thread

All times are GMT -7. The time now is 01:55 PM.