General Discussion Anything SuperHawk Related

VTR project is 75% complete

Thread Tools
 
Search this Thread
 
Old 11-09-2009, 05:45 AM
  #1  
Senior Member
Back Marker
Thread Starter
 
aka Yamadog's Avatar
 
Join Date: Jan 2009
Location: Birmingham, AL
Posts: 179
aka Yamadog is on a distinguished road
VTR project is 75% complete

Well its been almost a year and I still have not finished the SuperHawk. Thought I would post a couple of pics an get some feedback, criticism, or otherwise well intended advise. I have the SP1 front end to install and wheels to change. Heli-bars, Watsen turn signals, polished engine covers, and some mirrors which don't yet exist are next. The tank bra and Silver Honda wings are being deleted. The plan is to paint the new rear wheel RED and the front black. Also black paint on the lower cowl. Still considering Jet-Hot coating for the headers. I have not installed the velocity stacks or re-jetted yet. Jamie will be upgrading the suspension for me and after that...I'm going to ride!
Last pic...I still have the TBR cans FS in the classifieds. If they dont sell I'll shorten one and use it on the Versys.
Attached Thumbnails VTR project is 75% complete-super-hawk.jpg   VTR project is 75% complete-p1010177.jpg   VTR project is 75% complete-p1010104.jpg  
aka Yamadog is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
98VTRrider
Everything Else
12
05-15-2011 09:21 AM
Galaxieman
Modifications - Cosmetic
12
10-13-2009 03:47 AM
seaton001
Modifications - Performance
37
05-08-2007 12:45 PM
crazybrit
Classifieds
3
04-22-2007 04:57 PM
Firehawk_ordie
Classifieds
8
04-17-2007 08:13 PM



Quick Reply: VTR project is 75% complete



All times are GMT -7. The time now is 08:04 PM.